HomeSolutionMotorcycle

Project Introduction:

The project adopts 26 load-bearing assembled AGVs and 18 latent traction AGVs to realize the automatic circulation of vehicle assembly and SPS material distribution in a motorcycle enterprise, and to meet the annual production capacity of 60,000 two-wheeled large-displacement motorcycles. The production site is highly efficient and standardized.

  

Return to list
在線客服